Dear Colleagues,
Under certain circumstances Production Scheduler need to sequence some operations manually so we are using Heuristic SAP003 "Schedule Sequence Manually".
In order to achieve this, it would be very useful (and with real added value to the scheduler task) to have some extra field in the "List of operations" when using the algorithm /SAPAPO/HEUR_PLAN_SEQUENCE_MAN
Image may be NSFW.
Clik here to view.
The field we need to add are stored at Planned Order/Production order level and are relevant for all operations in it. The fields are specific characteristics:
Image may be NSFW.
Clik here to view.
The question: Is there a non ABAP way we can ask the system to add the required fields in to the layout of the "Sequence to be planned" list, so the Production Scheduler can take better decisions?
Thanks in advance.
Best regards,
Rubén P.
Message was edited by: Rubén Partido