Quantcast
Viewing all articles
Browse latest Browse all 8065

Add fields to Algorithm /SAPAPO/HEUR_PLAN_SEQUENCE_MAN

Dear Colleagues,


Under certain circumstances Production Scheduler need to sequence some operations manually so we are using Heuristic SAP003 "Schedule Sequence Manually".


In order to achieve this, it would be very useful (and with real added value to the scheduler task) to have some extra field in the "List of operations" when using the algorithm /SAPAPO/HEUR_PLAN_SEQUENCE_MAN

Image may be NSFW.
Clik here to view.
List of fields.png

 

 

The field we need to add are stored at Planned Order/Production order level and are relevant for all operations in it. The fields are specific characteristics:

Image may be NSFW.
Clik here to view.
Required fields.png

 

The question: Is there a non ABAP way we can ask the system to add the required fields in to the layout of the "Sequence to be planned" list, so the Production Scheduler can take better decisions?

 

Thanks in advance.

 

Best regards,

 

Rubén P.

 

Message was edited by: Rubén Partido


Viewing all articles
Browse latest Browse all 8065

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>