I don*t know if that's solving my problem. I have one Material in two factories- factory A and factory B. I want that when this material ist ordered from a user with a normal cost centre in factory A it should be a normal requisition with the supplier factory A and when this material is ordered from a user with a specific cost centre the supplier should be the factory B.
↧